| Cross Updating | Release Notes | Doc Center | FAQ's | Manual |
Every so often it is advisable to update all remote sites from the master machine, you may be adding a new site or one of the remote machines may have had a failure. With the amount of data involved doing this via the modem may be un-economical - you should use tapes.
Note: Because there will be times you need to transfer files back and forward between machines you MUST ensure that you have compatible tape drives or some other form of compatible media e.g. Jaz/Zip drives.
This procedure is best run at night or over a weekend to avoid disrupting the practice schedule.
To allow the system to update themselves with historic work. You can switch on the Auto-Fix option in the Parameters menu. This sends a small number of records every time work is integrated.
x_send followed by x_check
Log in and integrate any work
Stop using this machine till the files have been transferred.
This makes sure any unsent work is queued for the master machine and there are no log files around that may get integrated at a later date causing duplication.
This will ensure that there is no work remaining on the remote machines that will get missed.
We don't want any work to arrive while the backup/transfer is taking place.
This will ensure that the remote work is in a location the vet system can find.
As the master machine can forward work this ensures any work generate via the above x_check will be removed.
Gets the master database up-to-date.
Make any changes etc. to the master file, remove duplications, run bad debt programs, validations etc. Anything that will affect the client files that does not get cross updated. It is also a good idea to add a dummy note to the play card, this will allow you to the check that every thing worked ok later on.
Pick xmenu option 5 then option 3 to prepare a transfer file. Unless you have very little data you will be advised to pick the transfer to tape option as modem transfer may take a while.
Select option 5 then option R to extract the work from the tape.
Run x_check to move the work into the correct place
Login and check the data is valid, check the dummy note you added to
the play card.
If all appears OK then users can start using the machine again.
|
|
|